CONFIDENTIALITY: The information, comments and opinions contained in the report including any and all attached photographs, copies of reports and similar documents are for the use of the Gap Inc. business units and its subsidiary companies. Do not distribute or photocopy this report without receiving prior written consent from GIS VQM department.
Section
Q no.
Question
Add#2 Product
Safety
1
Is there appointed Product Safety Officer (PSO)
checking 100% production site in monthly basis and submit GIS Product Safety
Compliance Checklist as per GIS requirement?
Add#2 Product
Safety
2
Is metal free zone under well control in sample
room, the whole production floor and QC room?
Add#2 Product
Safety
3
Is there regularly checking and maintenance of
the mold and machine for snaps/rivets…etc. so factory ensure 100% that the
molding process is compliance?
Add#2 Product
Safety
4
Is broken needle log checked, verified and
maintained the records properly?
Add#2 Product
Safety
5
Is Pull Test equipment available and correctly
performed to test the attachment strength of snaps/rivet/ small parts?
Add#2 Product
Safety
6
Is Needle Detector function correctly and
correctly performed by 9 point checking and record complete 3 times per
shift?
(1.2 mm sensitivity)
Add#2 Product
Safety
7
Is the metal free zone properly controls of all
metal/tools/ hard tag with limited authorizes person to enter?
Add#2 Product
Safety
8
Is Button Control Procedure checked, verified
and maintained the records properly?
Section |
Q no. |
Question |
Add#3 Printing/Plating |
1 |
Are buyer's approved samples/Tech Pack/ trim cards provided as guides for operators? |
Add#3 Printing/Plating |
2 |
Is printing/plating automatic or manual ( including drying) and machines/spare parts in correct setting, well maintained and clean? |
Add#3 Printing/Plating |
3 |
Are screens made in-house or contracted to outside source? |
Add#3 Printing/Plating |
4 |
Is there organized and controlled storage area for chemicals and MSDS sheet display and all the workers well trained to follow the SOP accordingly? |
Add#3 Printing/Plating |
5 |
Are in-process and finished pieces inspected in hourly basis in enough lighting to ensure consistency in Print Quality ? |
Add#3 Printing/Plating |
6 |
How are seconds replaced before releasing back to production workflow? |
Add#3 Printing/Plating |
7 |
Is the working environment/ housekeeping /tray/ racks/ trolleys/ tables/aisles clean and tidy?
|
Section |
Q no. |
Question |
Add#4 Embroidery |
1 |
Does the factory have adequate embroidery machines to fulfill the overall production capacity? |
Add#4 Embroidery |
2 |
Are embroidery machines properly maintained, regularly cleaned and serviced, and in good working condition? |
Add#4 Embroidery |
3 |
Are in-process and finished pieces inspected and seconds replaced before releasing back to production workflow? Are there proper control of deviations per load? |
Add#4 Embroidery |
4 |
Is thread SPI/tension well monitored and controlled, and thread ends properly trimmed? |
Add#4 Embroidery |
5 |
Does the embroidery facility have a broken needle control process and are all outgoing panels checked? |
Add#4 Embroidery |
6 |
Is there visual checking 100% and separate packed per shade in enough lighting when needed? |
Section |
Q no. |
Question |
Add#5 Laundry |
1 |
Is laundry capacity adequate in needed machine type to effectively support the overall production output? |
Add#5 Laundry |
2 |
Are machines adequately maintained so no steam/water leakage, no rusting or broken parts? |
Add#5 Laundry |
3 |
Is there checking of machine temp and RPM with record? Is there infra-red temperature checking device available? |
Add#5 Laundry |
4 |
Any calibrated measuring devices used? E.g. weight, beaker |
Add#5 Laundry |
5 |
Are laundry formulas, buyer approved samples in shade/hand feel & Tech Pack readily available for operators' and inspector's easy reference? |
Add#5 Laundry |
6 |
Is laundry managed by qualified technician / chemist? |
Add#5 Laundry |
7 |
Does laundry follow GAP PH & Crocking SOP? E.g. incoming water control, washing receipt control, testing of result, separation of wash lot, test per wash lot …etc. |
Add#5 Laundry |
8 |
Is there 100% visual/shade checking in correct light source and separately packed to return to next bulk process? |
Add#5 Laundry |
9 |
Is there measurement and hand feel checking per machine load with record? |
Add#5 Laundry |
10 |
Is there light box with buyer required light source available? |
日月新半导体(昆山)有限公司成立于2004年,坐落于江苏省昆...
苏州市双双电器有限公司,成立于2012年,位于江苏省苏州市枫...
涛美远东日用制品有限公司成立于2001-06-28,企业注册...
东莞乐存实业有限公司成立于2016年03月24日,注册地位于...
越南太普科技有限公司拥有独立的研发、采购、生产和销售体系,主...